
EV Charger + Panel Upgrade Bundle โ Toronto's Smart EV Setup
Professional ev charger + panel upgrade bundle services in Toronto and the Greater Toronto Area. Licensed, insured, and trusted by homeowners across the GTA.
Projects Completed
Years Experience
Client Satisfaction
Google Rating
How It Works
A simple, stress-free process from start to finish.
Send Your Request
Call or WhatsApp us 24/7. Send photos, video, comments about what needs to be done, and your location.
Remote Estimate
We review everything, discuss details, and provide a clear estimate โ often within hours, no visit needed.
Repair Process
Our licensed team arrives on the agreed date and completes your ev charger + panel upgrade bundle to the highest standards.
Handover & Warranty
Final walkthrough with you, full cleanup, and warranty documentation provided.
Send Your Request
Call or WhatsApp us 24/7. Send photos, video, and a description of the work + your location.
Remote Estimate
We review everything, clarify details, and give you a price โ often within hours.
Repair Process
Licensed team arrives on schedule and completes your ev charger + panel upgrade bundle professionally.
Handover & Warranty
Final walkthrough, full cleanup, and warranty documentation.
EV Charger + Panel Upgrade Bundle in Toronto GTA
Are you ready to charge your electric vehicle at home but worried your old 100-amp panel cannot handle a Level 2 charger? RenoHouse offers a complete EV Charger + Panel Upgrade Bundle for Toronto and GTA homeowners โ pairing a 100A-to-200A electrical panel upgrade with a fully installed Level 2 EV charger in a single coordinated project. This bundled approach saves time, money, and ESA permit fees compared to scheduling two separate jobs, and is by far the smartest way to set up home charging for a Tesla, Hyundai Ioniq, Kia EV6, Ford F-150 Lightning, Rivian, or any modern Level 2-capable electric vehicle. In roughly 60 to 70 percent of older Toronto homes, the existing 100-amp panel simply cannot accommodate a 40A or 48A Level 2 charger alongside the existing electric stove, dryer, central air conditioner, hot tub, and other modern loads. Trying to add an EV charger to a maxed-out panel risks tripping breakers, overheating the service mast, accelerated panel wear, and Toronto Hydro non-compliance. The right answer is a panel upgrade โ and bundling it with the charger install is the smartest way to do it. Our ESA-certified electricians install all leading Level 2 chargers including Tesla Wall Connector (48A hardwired), ChargePoint Home Flex (50A), FLO Home X5 (Canadian-made, 30A), Wallbox Pulsar Plus (40A with built-in load management), Grizzl-E Smart (40A, made in Canada), and Emporia EV Charger. We coordinate the entire bundle: pulling the ESA permit, scheduling the Toronto Hydro service disconnect, installing the new 200A panel and meter base, replacing the service entrance cable if needed, running the dedicated 60A circuit to your charging location through finished walls or buried in conduit, mounting the charger, configuring the smart-charging app, and arranging the final ESA inspection. Power is typically off only for 4 to 6 hours during the panel swap and is restored before evening on the same day. Total bundled cost ranges from $4,000 to $8,000 depending on panel location, mast condition, charger model, and the length of the run from the new panel to the charger. This is significantly less than booking the panel upgrade and charger install as two separate visits โ typically saving $800 to $1,500 in mobilization, separate ESA permit fees, and duplicated labour. RenoHouse also helps you claim the Save on Energy EV charger rebate (up to $1,000 in Ontario when current programs are active) and any applicable utility or municipal incentives. For homeowners who do not need a full panel upgrade, we also offer a load-management alternative โ the DCC-9-60 device monitors your panel's draw in real time and automatically pauses EV charging when whole-home demand spikes. This can let you keep your 100A panel for $2,500 to $4,000 total. We assess load calculations during the free in-home estimate and recommend whichever option saves you the most money long-term while still supporting your charging needs. This service is most popular in single-family-home suburbs where homeowners just bought their first or second EV โ Etobicoke, North York, Scarborough, Mississauga, Brampton, Markham, Vaughan, Oakville, and Richmond Hill lead in bundle requests. Demand is also growing in older central Toronto neighbourhoods (Riverdale, Leslieville, Roncesvalles, the Annex, Forest Hill) where original 60A and 100A panels are often the limiting factor. We work with all major Toronto Hydro service classes and coordinate full service mast replacement when required. Most bundled projects are completed in a single day with power restored before evening. Larger jobs requiring service mast replacement add 4 to 6 weeks of Toronto Hydro lead time but are still completed in a single on-site day once scheduled. RenoHouse serves Toronto, Mississauga, Brampton, Vaughan, Markham, Richmond Hill, Oakville, Burlington, Scarborough, North York, Etobicoke, and all surrounding GTA communities. Call 289-212-2345 for your free EV Charger + Panel Upgrade Bundle estimate today.

Why Trust RenoHouse
On-Time Completion
We respect deadlines for ev charger + panel upgrade bundle projects. 95% of jobs finish on or ahead of schedule.
Certified & Insured
Proper licensing, full insurance coverage, and WSIB protection. Your property and our team are completely protected.
Satisfaction Guarantee
We're not done until you're 100% happy with your ev charger + panel upgrade bundle. That's our promise.
Sound Familiar?
These are the most common problems our clients face.
Need professional help with this?
Not sure where to start?
Want quality results the first time?
Tired of putting it off?
Looking for a reliable contractor?
Want a free, no-obligation estimate?
Ready to get started?
Free estimate, no obligation. We respond within 1 hour.
What Our Clients Say
โRenoHouse replaced all our windows in just two days. The new windows are beautiful, energy-efficient, and the team left everything spotless. Highly recommend!โ
Michael R.
Oakville
โNew windows transformed our home. Quieter, warmer, and our energy bill dropped noticeably. Excellent installation crew.โ
David K.
Vaughan
โProfessional from start to finish. They replaced 8 windows in one day and cleaned up perfectly. Highly recommend RenoHouse!โ
Sandra W.
Burlington
Our EV Charger + Panel Upgrade Bundle Work
Professional ev charger + panel upgrade bundle results from RenoHouse projects across the Toronto GTA.

EV Charger + Panel Upgrade Bundle
Toronto GTA

Quality Workmanship
Licensed & Insured
Like what you see? Let's talk about your project.
Frequently Asked Questions About EV Charger + Panel Upgrade Bundle
Most Toronto homes built before 2000 have 100-amp panels that are already near capacity with central AC, electric stove, and dryer loads. A Level 2 charger draws 32 to 48 amps continuously, which usually requires upgrading to 200 amps. RenoHouse runs a load calculation during the free estimate to confirm whether you need an upgrade or can use load management.
Typical bundled cost ranges from $4,000 to $8,000 in the Toronto GTA. This includes the 200A panel, meter base, ESA permit, Toronto Hydro coordination, the Level 2 charger unit, the dedicated 60A circuit, and the final inspection. Service mast replacement adds $1,500 to $3,000 if the existing mast is undersized or damaged.
RenoHouse installs all major Level 2 chargers including Tesla Wall Connector, ChargePoint Home Flex, FLO Home X5, Wallbox Pulsar Plus, Grizzl-E Smart, and Emporia EV Charger. We help you choose based on your vehicle, smart home preferences, and whether you want hardwired or NEMA 14-50 plug-in installation.
Most EV Charger + Panel Upgrade Bundles are completed in a single day, typically 8 to 10 hours. Power is off for 4 to 6 hours during the panel swap, then restored after the new panel is energized. The charger circuit and unit are installed and tested before our team leaves.
Yes, RenoHouse handles the complete permit process. We pull a single ESA permit covering both the panel upgrade and the EV charger circuit, coordinate the Toronto Hydro service disconnect and reconnect, and schedule the final ESA inspection. You do not need to make any calls or paperwork yourself.
Yes, Ontario homeowners can claim up to $1,000 through the Save on Energy program when installing an eligible Level 2 smart charger. RenoHouse provides all required paperwork and receipts to support your rebate application. Eligibility and rebate amounts can change, so we confirm current program rules during your estimate.
Bundling saves $800 to $1,500 in duplicate mobilization, separate permit fees, and labour. It also eliminates the awkward gap where your charger is installed but cannot be safely used until the panel is upgraded. A single coordinated project means one ESA inspection, one Toronto Hydro coordination, and one team arriving once instead of twice.
If your service mast is too small, damaged, or located in the wrong place, we coordinate a full service mast upgrade with Toronto Hydro as part of the project. This adds 4 to 6 weeks of lead time for Toronto Hydro scheduling and roughly $1,500 to $3,000 in additional cost. We assess mast condition during the free estimate.
Yes. A 200-amp panel installed for an EV charger bundle has plenty of capacity for a second Level 2 charger if you add a second EV later. Many of our clients pre-wire conduit during the bundle so adding the second charger costs only $400 to $800 in the future. Tell our electrician during the estimate if you anticipate a second EV.
Yes. Detached garages and long runs (40+ feet from the panel) often require upsized wire (typically 4 AWG copper or 2 AWG aluminum) and conduit through finished walls or buried in trenches. We assess the run during the free estimate, price accordingly, and handle any drywall patching, conduit work, or trenching required for a clean installation.
We Serve All GTA
Professional ev charger + panel upgrade bundle services available across the Greater Toronto Area.
โUpgraded our panel from 100 to 200 amps and installed 12 pot lights throughout the main floor. Everything passed ESA inspection first time.โ
โ Sarah K., Vaughan
Get a Free EV Charger + Panel Upgrade Bundle Estimate
Contact us today for a free, no-obligation quote for your ev charger + panel upgrade bundle project in Toronto GTA. We'll get back to you within 1 hour.





