Skip to main content
RenoHouseRenoHouse
Multiplex Conversion (2-4 Plex) services Toronto GTA
Multi-Unit & ARU Conversions📞 Available 24/7

Multiplex Conversion in Toronto — Duplex, Triplex, Fourplex As-of-Right

Professional multiplex conversion (2-4 plex) services in Toronto and the Greater Toronto Area. Licensed, insured, and trusted by homeowners across the GTA.

4.9/5from 498+ reviews
Licensed & Insured
WSIB Covered
4.9/5 Google Rating
11+ Years
Free Estimates
0+

Projects Completed

0+

Years Experience

0%

Client Satisfaction

0.9★

Google Rating

How It Works

A simple, stress-free process from start to finish.

Send Your Request

Call or WhatsApp us 24/7. Send photos, video, and a description of the work + your location.

Remote Estimate

We review everything, clarify details, and give you a price — often within hours.

Repair Process

Licensed team arrives on schedule and completes your multiplex conversion (2-4 plex) professionally.

Handover & Warranty

Final walkthrough, full cleanup, and warranty documentation.

Multiplex Conversion (2-4 Plex) in Toronto GTA

RenoHouse converts existing Toronto detached, semi-detached, and row-house homes into legal 2-, 3-, and 4-unit multiplexes — duplex, triplex, fourplex — under Toronto Bylaw 474-2023 (multiplex as-of-right, May 2023) and the broader Bill 23 / Bill 109 framework. Multiplexes are permitted city-wide in RD, RS, and RT zones, with similar built-form standards to detached houses. We also build new-construction multiplexes from the ground up where the homeowner is rebuilding or where a tear-down strategy makes sense. **What 474-2023 enables.** Up to 4 units (duplex, triplex, fourplex) on every lot in RD, RS, and RT zones. Maximum height up to 10 m where existing zoning permits. Up to two porches/decks/balconies per unit. NO parking minimums (already removed February 2022 city-wide). Front-entrance restrictions for secondary suites have been deleted. Multiplex buildings can be conversions of existing homes OR new construction. The bylaw effectively ended single-family-only zoning in Toronto, three years ahead of any provincial mandate. **Conversion scope.** A typical 4-unit conversion of a 2,000–2,500 sq ft existing detached home includes: structural engineering (new beams for relocated bearing walls, sometimes underpinning of existing foundation for basement unit head height), 45-minute fire separation between units (Type 1 or Type 2 assembly per OBC 9.10.9), independent egress for each unit (typically separate exterior doors), independent HVAC and metering per unit (or sub-metered with landlord-paid utilities), independent kitchens and full bathrooms, smoke and CO interconnection per OBC 9.10.19, sound transmission control (STC ≥ 50 between dwelling units per OBC 9.11), and ESA-permitted electrical with sub-panels for each unit. **Cost (2026 CAD).** Conversion hard cost $200–$400 per square foot of renovated area on top of the existing structure (so a 2,500 sq ft home renovated as 4-plex: $500K–$1M conversion cost). Smaller-scope 2-unit basement legalization or duplex conversion: $100K–$250K. Mid-scope 3-unit (basement + two main-floor units): $250K–$500K. Full 4-unit conversion with structural changes and additions: $500K–$1M. New-build multiplex (tear-down + new construction): $350–$550 per square foot, $700K–$1.5M for a typical 3,000 sq ft 4-unit. **Code requirements (Ontario Building Code Part 9 and Part 11).** Fire separation 45-minute Type 1 between dwelling units (gypsum drywall assembly, fire-rated doors). Sound separation STC ≥ 50 between units. Smoke alarm and carbon monoxide interconnection across all units. Each unit must have independent egress (means of egress per OBC 9.9). Each unit needs full kitchen, full bathroom, independent heating control. Window openings sized for natural light and ventilation per OBC 9.7. Electrical sub-metering per ESA Section 8 (or single-meter with landlord-paid utilities). Plumbing per OBC 7 with separate fixture counts per unit. **Pitfalls we manage.** (1) Underpinning for basement unit head height — required when ceilings are < 6'5" (1.95 m); $30K–$80K added cost depending on perimeter and foundation type. (2) Egress from second/third floor — when interior staircase is shared, fire separation of the staircase becomes the critical OBC issue; sometimes an exterior fire escape is the only practical solution. (3) Heritage Conservation Districts — exterior alteration triggers Heritage Permit; major modifications may not be approvable. (4) Vacant possession — most full-scope conversions require vacant possession during construction; tenant management and Landlord and Tenant Board procedures are the homeowner's responsibility, not ours. (5) Development charges — 3rd and 4th units are Bill 23 exempt ($0); 5th unit and beyond triggers standard DCs (~$45K–$55K per unit) but is generally not in scope under 474-2023. **The 5-unit play (CMHC MLI Select).** Sophisticated investors pursue a 4-unit multiplex (main house) PLUS a garden suite or laneway suite (1 additional unit) = 5 units total, which crosses the CMHC MLI Select threshold. MLI Select unlocks up to 95% LTV financing, up to 50-year amortizations (with surcharge above 25), and forgivable energy-efficiency grants up to $85K/unit for NZE-ready builds. We deliver the construction; the financing structuring is between you and your mortgage broker — we do NOT arrange financing. **Timeline.** Smaller 2-unit conversions: 4–8 months. 3-unit conversions: 6–12 months. Full 4-unit conversions with structural changes and additions: 12–18 months. New-build multiplex tear-downs: 14–24 months including demolition and rebuild. Vacant possession during construction is required for most full-scope conversions. **Honest scope.** RenoHouse handles construction, project management, permits (building, ESA, plumbing, demolition), and trade coordination. Architectural design and structural engineering are delivered through named OAA-licensed and PEng-licensed partners — not in-house. We do not arrange financing, prepare income tax returns, or represent landlords at the Landlord and Tenant Board. Serving Toronto, Mississauga, Brampton, Vaughan, Markham, Richmond Hill, Oakville, Burlington, Etobicoke, Scarborough, North York, and all GTA communities. Call 289-212-2345 for a free conversion-feasibility consultation.

Licensed & insured professionals
Free, no-obligation estimates
Quality materials & workmanship
On-time, reliable service
Serving all of Toronto GTA
Competitive, transparent pricing
Multiplex Conversion (2-4 Plex) work by RenoHouse Toronto GTA

Why Trust RenoHouse

On-Time Completion

We respect deadlines for multiplex conversion (2-4 plex) projects. 95% of jobs finish on or ahead of schedule.

Certified & Insured

Proper licensing, full insurance coverage, and WSIB protection. Your property and our team are completely protected.

Satisfaction Guarantee

We're not done until you're 100% happy with your multiplex conversion (2-4 plex). That's our promise.

Common Issues

Sound Familiar?

These are the most common problems our clients face.

Want to convert your Toronto detached into a legal 4-plex under 474-2023?

Basement ceilings under 6'5" and not sure if underpinning is worth it?

Confused about 45-min fire separation, STC 50, and OBC requirements?

Targeting 5-unit CMHC MLI Select stack but need the construction first?

Tenants in place — when do you need vacant possession?

Old electrical panel and need ESA-permitted sub-metering for 4 units?

Ready to get started?

Free estimate, no obligation. We respond within 1 hour.

What Our Clients Say

RenoHouse replaced all our windows in just two days. The new windows are beautiful, energy-efficient, and the team left everything spotless. Highly recommend!

Michael R.

Michael R.

Oakville

New windows transformed our home. Quieter, warmer, and our energy bill dropped noticeably. Excellent installation crew.

David K.

David K.

Vaughan

Professional from start to finish. They replaced 8 windows in one day and cleaned up perfectly. Highly recommend RenoHouse!

Sandra W.

Sandra W.

Burlington

Our Multiplex Conversion (2-4 Plex) Work

Professional multiplex conversion (2-4 plex) results from RenoHouse projects across the Toronto GTA.

Multiplex Conversion (2-4 Plex) project by RenoHouse

Multiplex Conversion (2-4 Plex)

Toronto GTA

Multiplex Conversion (2-4 Plex) completed project

Quality Workmanship

Licensed & Insured

Like what you see? Let's talk about your project.

Frequently Asked Questions About Multiplex Conversion (2-4 Plex)

Smaller 2-unit basement legalization or duplex: $100K–$250K. 3-unit conversion (basement + two main-floor): $250K–$500K. Full 4-unit conversion with structural changes and additions: $500K–$1M. New-build multiplex (tear-down + new): $700K–$1.5M for a 3,000 sq ft 4-unit, $350–$550/sq ft. Cost depends heavily on existing structure (underpinning needs, electrical capacity, basement head height), scope (egress changes, kitchens, structural beams), and finish level.

Bylaw 474-2023 (May 10, 2023) permits up to 4 units (duplex, triplex, fourplex) on every lot in RD, RS, and RT residential zones in Toronto, with built-form standards similar to detached houses. Maximum height up to 10 m where existing zoning permits. Up to two porches/decks/balconies per unit. No parking minimums (removed city-wide February 2022). Front-entrance restrictions for secondary suites deleted. Multiplexes can be conversions OR new construction. This bylaw effectively ended single-family-only zoning in Toronto.

Bill 23 (More Homes Built Faster Act, 2022) requires every Ontario municipality to permit up to 3 ARUs per lot as-of-right where servicing is available, removes parking minimums for ARUs, and reduces or eliminates development charges for ARUs. Toronto exempts the 3rd and 4th units from development charges entirely under 474-2023. Bill 23 also reduces planning fees and conservation authority approvals. The 5th unit (and beyond) triggers standard DCs of ~$45K–$55K per unit.

Ontario Building Code requires 45-minute fire separation between dwelling units (Type 1 or Type 2 assembly per OBC 9.10.9) — typically achieved with double-layer 5/8" Type X gypsum drywall on resilient channels with mineral wool or rockwool insulation in stud cavities. Fire-rated doors (20-min minimum) on demising walls. Smoke and CO alarm interconnection across all units per OBC 9.10.19. Sound transmission control STC ≥ 50 between units per OBC 9.11. Each unit needs independent egress per OBC 9.9 — usually separate exterior doors.

Often, yes — required when basement ceiling height is less than 6'5" (1.95 m), the OBC minimum for habitable rooms. Underpinning lowers the basement floor by excavating and pouring new footings deeper than the existing foundation; typical scope adds $30K–$80K to project cost depending on perimeter and foundation type (concrete vs. stone vs. brick). Many older Toronto homes (pre-1950) have head heights of 6'2"–6'4" and require underpinning to legalize a basement unit.

Almost always yes. Full-scope structural changes, demising wall additions, and major mechanical work cannot be done with tenants in place — both for safety reasons and because the existing units rarely match the new floor plan. Vacant possession during construction is the homeowner's responsibility (Landlord and Tenant Board procedures, N12/N13 notices, compensation). RenoHouse does NOT represent landlords at the LTB — please consult a paralegal or landlord-tenant lawyer for that scope.

CMHC MLI Select is a multi-unit residential mortgage insurance program for 5+ unit rental properties. Benefits: up to 95% loan-to-value (5% down), up to 50-year amortization (with surcharge), and forgivable energy-efficiency grants up to $85K/unit for NZE-ready builds. Toronto strategy: convert main house to fourplex (4 units) + add garden or laneway suite (1 unit) = 5 units → eligible for MLI Select. We deliver the construction; we do NOT arrange financing — refer to your mortgage broker for MLI Select structuring.

2-unit basement legalization or duplex: 4–8 months. 3-unit conversion: 6–12 months. Full 4-unit conversion with structural changes: 12–18 months. New-build multiplex (tear-down + new construction): 14–24 months. Permit drawings 6–10 weeks; plan review 8–14 weeks (longer than ADUs because Building Department reviews multi-unit OBC compliance more carefully); construction 16–40 weeks depending on scope.

Toronto 2026 rents per unit: 1BR basement (after underpinning) $1,500–$2,200/month, 1BR main-floor $1,800–$2,500/month, 2BR upper-floor $2,500–$3,200/month, 2BR penthouse $2,800–$3,500/month. Total gross rent on a typical 4-plex: $7,500–$11,000/month. After vacancy, operating expenses, and maintenance reserve, NOI on a $1.05M total-cost build (acquisition + conversion) typically $65K–$85K/yr — a 4.5–5.5% cap rate (Toronto market-typical). Cash-on-cash with 95% MLI Select financing can reach 12–18%.

Yes — we have HCD project experience in Cabbagetown, Riverdale, and the Annex. HCD multiplex conversions require a Heritage Permit alongside the building permit; exterior alterations must be compatible with the district's character. Some major scope items (rear additions, third storey additions, exterior staircases for egress) may not be approvable in HCDs and need to be redesigned. Heritage Permit adds 4–8 weeks and design adjustments. We work with designers familiar with each Toronto HCD.

RenoHouse delivered our 2-bedroom garden suite on a tight Roncesvalles lot in 11 months from contract to occupancy. Final cost within 4% of quote — rare in this market.

Daniel & Priya R., Roncesvalles, Toronto

Get a Free Multiplex Conversion (2-4 Plex) Estimate

Contact us today for a free, no-obligation quote for your multiplex conversion (2-4 plex) project in Toronto GTA. We'll get back to you within 1 hour.

Multiplex Conversion (2-4 Plex)
Call NowFree Quote