
Retail TI From Grey-Shell To Grand-Opening.
Professional retail store buildout services in Toronto and the Greater Toronto Area. Licensed, insured, and trusted by homeowners across the GTA.
Projects Completed
Years Experience
Client Satisfaction
Google Rating
How It Works
A simple, stress-free process from start to finish.
Send Your Request
Call or WhatsApp us 24/7. Send photos, video, comments about what needs to be done, and your location.
Remote Estimate
We review everything, discuss details, and provide a clear estimate — often within hours, no visit needed.
Repair Process
Our licensed team arrives on the agreed date and completes your retail store buildout to the highest standards.
Handover & Warranty
Final walkthrough with you, full cleanup, and warranty documentation provided.
Send Your Request
Call or WhatsApp us 24/7. Send photos, video, and a description of the work + your location.
Remote Estimate
We review everything, clarify details, and give you a price — often within hours.
Repair Process
Licensed team arrives on schedule and completes your retail store buildout professionally.
Handover & Warranty
Final walkthrough, full cleanup, and warranty documentation.
Retail Store Buildout in Toronto GTA
GTA retail TI — demising wall fire ratings, AODA service-counter compliance, landlord coordination, base-building tie-ins. $80-$280/sf.

Retail buildouts in the GTA in 2026 span the widest cost range of any commercial vertical — a kiosk refit in Yorkdale runs $80/sf, a flagship boutique on Yorkville hits $280/sf, and a franchise apparel store in a Premium Outlets center lands in the middle at $130-$160/sf. The variable isn't ambition; it's landlord requirements (some malls require Class A construction with specific trades), brand standards from the franchisor, and demising-wall fire ratings. AOV: $180K (1,500 sf boutique) to $1.2M (5,000 sf flagship).
What makes retail different from office or medical is that you're often working inside an active shopping centre with strict construction-hour rules (typically 11pm-7am inside enclosed malls), barricade and dust-protection specs reviewed by mall ops, freight-elevator booking windows, and demolition debris removal logistics that turn what looks like a 6-week project on paper into 10-12 weeks on the ground.
2026 GTA Pricing Tiers
Floor — $80-$120/sf ($150K-$350K project) Simple refit of existing retail, light demo, paint, new fixtures, basic LED lighting upgrade to 1500 lm/m², minor electrical (no service upgrade), new floor (LVP like Shaw 5mm or Mannington Spacia), basic POS counter in laminate. Best-suited to value retail, mobile carriers, small QSR.
Standard — $130-$190/sf ($380K-$900K project) Full buildout from grey shell in a mall or street-front: demising wall to landlord 1-hr fire rating, suspended drywall ceiling with custom soffit lighting, polished concrete or porcelain tile floor (Daltile or Olympia), custom millwork casework, 3-phase electrical service upgrade (typical 200A 120/208V to 400A), rooftop HVAC tie-in or supplemental Mitsubishi VRF, AODA service counter section (1830mm length max 865mm height), one accessible fitting room (1500mm clear turning radius).
Premium — $220-$280/sf ($1M-$2.5M project) Flagship boutique or luxury concept — Yorkville, Bloor, Yorkdale Premium, CF Sherway. Custom millwork in walnut/oak veneer (Henrybuilt or Mattamy Millwork tier), specialty lighting like Erco or iGuzzini track + accent, terrazzo or large-format porcelain (1200x2400mm slabs), integrated AV with digital signage, custom HVAC zoning with humidity control for textiles, full glass storefront with motorized swing door (Stanley Magic or Horton), back-of-house workspace + secure stock room with electronic access control.
Code & Regulatory Compliance
- OBC Part 3 (most malls and Class A street-front) or Part 9 (small standalone) — fire separations between tenants typically 1-hr; if your unit is adjacent to a stock room with hazardous storage or above/below residential, 2-hr.
- Demising wall construction — 1-hr fire-rated wall is typically 1x 5/8" Type X each side of 92mm steel stud at 406mm o.c., extending slab-to-slab (NOT to ceiling — slab-to-slab is the test, and a frequent fail point). 2-hr is 2x 5/8" each side.
- AODA Design of Public Spaces + s. 80.27 (built environment) — service counter accessibility section, fitting room accessibility, washroom if provided to public, signage with tactile and Braille at permanent rooms.
- Ontario Fire Code — emergency lighting, exit signage, fire extinguisher rated 2A-10BC every 25m of travel, sprinkler density adjustments if you add high-pile racking (>3.7m).
- Ontario Electrical Safety Code (OESC) 27th ed. — for retail with display kitchens, espresso bars, juice bars, etc., dedicated GFCI/AFCI per current OESC. Service sizing must account for HVAC + lighting + receptacle + signage exterior.
- TSSA (if any gas) — retail with gas-fired equipment (rare except for in-store cafe) triggers TSSA permit.
- Toronto Sign Bylaw 297-2018 — exterior sign permit separate from building permit; restrictions on illumination intensity, projection, heritage district overlays. Yorkville, Distillery, Queen W. Conservation Zone all have additional layers.
5-Micromarket Considerations
Downtown core (Bloor / Yorkville / Eaton Centre / Yonge) — Premium AAA. CF Toronto Eaton Centre, Yorkville Village have strict TI design review by landlord (typically Cadillac Fairview or Bayview Place Mgmt). Construction hours 11pm-7am only; barricade specs custom per landlord; landlord-approved trades only for fire stopping, sprinklers, life safety. Add 15-25% over Mississauga pricing for these constraints alone.
North York / Scarborough / Etobicoke — Yorkdale, Fairview, Scarborough Town, Sherway. Mid-tier mall standards; slightly more flexibility on hours; better freight access. Yonge-Eglinton and Yonge-Sheppard street-front are gentrifying with higher-than-suburb expectations.
Mississauga / Brampton (Square One / Bramalea / Erin Mills) — Largest GTA mall (Square One) — full ORC mall TI standards similar to Yorkdale. Suburban plazas easier, more straightforward.
East York / Leslieville / Queen W. / Ossington — Heritage-district overlay common. Storefront preservation, signage restrictions, and Toronto Heritage Preservation Services review on facade. Interior largely unconstrained but exterior modifications can add 6-8 weeks to permit.
905 north (Vaughan Mills / Promenade / Hillcrest) — Vaughan Mills is a Premium Outlets-style center with tenant manuals as long as the OBC. Strict adherence to mall fixturing standards. Brand standards from US-based franchisors (Lululemon, Aritzia, Sephora) often override Canadian code in spec sheets — contractor must reconcile both.
Project Timeline
- Week 0-3: Brand standard / design package finalization
- Week 3-6: Permit application + landlord design review (parallel)
- Week 6-7: Permit issuance + freight elevator booking
- Week 7-9: Demo + barricade
- Week 9-13: MEP rough-ins, framing, ceiling grid
- Week 13-15: Drywall, prime, paint, floor
- Week 15-17: Casework, millwork, lighting, signage
- Week 17-18: Fixturing (often retailer's own team), inspections, opening
Typical 2,500 sf street-front: 14-18 weeks. Mall TI with overnight-only constraint: 16-22 weeks.
TI Allowance & Landlord Coordination
Retail TI varies hugely by landlord segment in 2026:
- AAA mall (Yorkdale, Eaton Centre, Sherway, Square One): $40-$120/sf, 7-10 yr lease, percentage rent kicker
- B-mall (Scarborough Town, Bramalea): $25-$60/sf, 5-7 yr lease
- Street-front Yorkville / Bloor / Queen W.: $20-$80/sf, 5-10 yr lease
- Power centre or strip plaza: $15-$40/sf, 5 yr lease + options
- Outlet center (Vaughan Mills, Toronto Premium): $30-$70/sf with brand spec review
Must-resolve items: HVAC tonnage allowance for retail occupant load (typically 350 W/m² minimum), electrical service capacity (200A minimum, 400A for any food or coffee program), demising wall fire rating responsibility (typically tenant), grease venting if any cooking (almost never permitted in standard retail leases), signage rights on facade + directory.
Specialty Trade Coordination
Retail buildouts typically run 8-12 specialty trades on top of standard GC: storefront and entrance system (Stanley Magic-Force or Horton Series 7000 automatic sliding/swing for AODA compliance); structural mall-front bulkhead (often heavier-gauge framing with motorized rolling shutter on mall side); landlord-approved fire-stopping (3M, Hilti, STI); landlord-approved sprinkler trade (often a short list of 2-3 firms per major mall); demountable fitting room hardware (Larson or custom); custom millwork shop (front-of-house casework, POS counter, back-of-house stock fixtures); signage (interior + exterior, both lit and non-lit, with brand-standard graphic package); structured cabling and POS networking; LED accent and track lighting (Erco, iGuzzini, Litelab, Soraa for color rendering on apparel); flooring specialist (large-format porcelain installer with rated thinset for substrate). Most retailers handle FF&E (fixtures, fittings, equipment) separately from base TI contract — typical FF&E adds 30-60% on top of construction cost.
Bottom Line
Retail TI is won at the LOI stage, not the construction stage. The decisions that determine whether your buildout lands at $130/sf or $220/sf are: which landlord, what hours can you work, who pays for the demising wall, what HVAC tonnage is allocated, and what's the franchisor's brand-standard floor plate. Get those locked at letter-of-intent and the construction phase is mostly trades execution. Sign first, negotiate later, and a $400K budget becomes $650K fast.
What Makes Us Different
Flexible Scheduling
Book retail store buildout appointments that fit your life. Evening and weekend slots available.
Quality Guaranteed
We don't cut corners. Every project follows industry best practices with premium materials and meticulous attention to detail.
No Hidden Fees
Straightforward pricing for retail store buildout. What we quote is what you pay — guaranteed.
Sound Familiar?
These are the most common problems our clients face.
Need professional help with this?
Not sure where to start?
Want quality results the first time?
Tired of putting it off?
Looking for a reliable contractor?
Want a free, no-obligation estimate?
Ready to get started?
Free estimate, no obligation. We respond within 1 hour.
What Our Clients Say
“RenoHouse replaced all our windows in just two days. The new windows are beautiful, energy-efficient, and the team left everything spotless. Highly recommend!”
Michael R.
Oakville
“New windows transformed our home. Quieter, warmer, and our energy bill dropped noticeably. Excellent installation crew.”
David K.
Vaughan
“Professional from start to finish. They replaced 8 windows in one day and cleaned up perfectly. Highly recommend RenoHouse!”
Sandra W.
Burlington
Our Retail Store Buildout Work
Professional retail store buildout results from RenoHouse projects across the Toronto GTA.

Retail Store Buildout
Toronto GTA

Quality Workmanship
Licensed & Insured
Like what you see? Let's talk about your project.
🧮 Retail Store Buildout Services — Cost Estimator
GTA / Ontario — 2026 market pricing
📊 Where the cost goes (typical breakdown)
📋 What affects your price:
💡 Estimates use 2026 GTA/Ontario market data. Actual cost depends on site conditions, material selections, and project scope. Book a free in-home quote for a precise number.
Frequently Asked Questions About Retail Store Buildout
Three reasons: construction hours (overnight-only Yorkdale/Eaton adds 25-35% labour), landlord-approved trades (limited bidder pool inflates pricing 15-20%), and finish-level expectations (luxury district customers see and pay for terrazzo not LVP). Demising-wall and base-building specs are largely consistent across the GTA.
Yes — for any fire-rated separation between tenants, the rated assembly must run slab-to-slab, not just to suspended ceiling. This is one of the most common pre-occupancy fail items because contractors stop framing at the bulkhead. Penetrations (ductwork, conduit, sprinkler) all need rated firestopping (Hilti CP 25 or 3M FB-3000WT).
Toronto Building retail TI without structural: 5-9 weeks. 905 municipalities: 4-7 weeks. Add 3-6 weeks for heritage district facade review (Yorkville, Queen W. Conservation, Distillery). Add 2-4 weeks for any change-of-use (e.g., retail to small-format food).
At least one section of service counter must be 1830mm long minimum, max 865mm above floor, with clear approach 1500mm. If the retail layout has only POS counters at 1067mm (standard bar height), you must provide an accessible companion section. Failing this is the most common AODA inspection deficiency.
Yes, via supplemental Mitsubishi M-Series or LG Multi-V VRF with rooftop condenser, IF the landlord approves the roof penetration and you can route refrigerant lines through a chase. Budget $35-65K for a 5-ton supplemental system. Many landlords will deny new roof penetrations on aging buildings — confirm in writing at LOI.
We Serve All GTA
Professional retail store buildout services available across the Greater Toronto Area.
“Renovated our entire main floor — kitchen, living room, flooring, paint, lighting. They coordinated everything perfectly. One contractor for the whole project.”
— Anthony G., North York
Get a Free Retail Store Buildout Estimate
Contact us today for a free, no-obligation quote for your retail store buildout project in Toronto GTA. We'll get back to you within 1 hour.







