Home Renovation Costs in Toronto 2026: Complete Price Breakdown
Planning a home renovation in Toronto? The single biggest question homeowners ask is: "How much will this cost?" The answer depends on the scope of work, materials, the age of your home, and current labor market conditions in the GTA.
This guide provides detailed, realistic cost breakdowns for every major renovation category — based on data from 498+ completed GTA projects between 2024 and early 2026. Whether you're refreshing a single room or gutting an entire house, you'll find the numbers you need to plan confidently.
---
Kitchen Renovation Costs in Toronto
The kitchen is the most popular renovation project in the GTA — and typically the most expensive. Costs vary dramatically based on scope.
Cosmetic Kitchen Refresh: $5,000–$15,000
A cosmetic refresh keeps your existing layout and cabinets but updates the look:
- Cabinet painting or refacing: $3,000–$8,000
- New countertops (laminate): $800–$2,500
- Updated hardware: $200–$600
- New backsplash: $800–$2,000
- Light fixture upgrade: $300–$1,000
- New faucet: $200–$600
This is the best ROI option for homeowners planning to sell within 2–3 years. Based on our project data, cosmetic kitchen refreshes in Toronto average $9,200.
Mid-Range Kitchen Renovation: $15,000–$35,000
A mid-range renovation replaces cabinets and upgrades surfaces without changing the layout:
- New stock or semi-custom cabinets: $5,000–$12,000
- Quartz countertops: $2,500–$6,000
- Tile backsplash (professional install): $1,200–$3,000
- New appliance package: $3,000–$8,000
- Flooring (vinyl plank or tile): $1,500–$4,000
- Plumbing updates: $800–$2,500
- Electrical updates: $500–$2,000
- Painting: $800–$1,500
- Labor: $4,000–$10,000
The average mid-range kitchen renovation in the GTA comes in at $24,500 based on 498+ projects.
Full Kitchen Gut Renovation: $35,000–$50,000+
A full gut renovation involves stripping the kitchen to studs and rebuilding — often with layout changes:
- Custom cabinetry: $12,000–$25,000
- Quartz or natural stone countertops: $4,000–$10,000
- Premium tile backsplash: $2,000–$5,000
- High-end appliances: $8,000–$20,000
- Plumbing relocation: $2,000–$5,000
- Electrical rewiring: $2,000–$5,000
- New flooring: $2,000–$5,000
- Permits and design: $1,500–$4,000
- Drywall, insulation, painting: $2,000–$5,000
- Labor (all trades): $8,000–$15,000
Full gut kitchen renovations in Toronto typically range from $40,000–$55,000 when layout changes and structural work are involved. Homes built before 1970 in areas like Scarborough, Etobicoke, and North York often hit the higher end due to outdated wiring and plumbing.
Kitchen Cost Comparison Table
| Scope | Cost Range | Timeline | Best For |
| Cosmetic Refresh | $5,000–$15,000 | 1–2 weeks | Resale prep, budget updates |
| Mid-Range Reno | $15,000–$35,000 | 3–5 weeks | Growing families, aging kitchens |
| Full Gut Reno | $35,000–$50,000+ | 6–10 weeks | Complete transformation, layout changes |
---
Bathroom Renovation Costs in Toronto
Bathrooms are the second most common renovation project. Size matters enormously — a powder room costs a fraction of a primary ensuite.
Cosmetic Bathroom Refresh: $3,000–$8,000
- New vanity and faucet: $800–$2,500
- Toilet replacement: $300–$800
- Mirror and lighting: $300–$1,000
- Paint: $300–$600
- New accessories: $200–$500
- Labor: $1,000–$2,500
Mid-Range Bathroom Renovation: $8,000–$18,000
- Tub/shower replacement or new surround: $2,000–$6,000
- Floor and wall tile: $2,000–$5,000
- New vanity (semi-custom): $1,200–$3,000
- Plumbing fixture upgrades: $500–$1,500
- Exhaust fan: $200–$600
- Electrical (GFI outlets, lighting): $500–$1,200
- Labor: $2,500–$5,000
Full Bathroom Gut Renovation: $18,000–$30,000+
- Complete demo and rebuild: $3,000–$5,000
- Custom tile shower with niche: $4,000–$8,000
- Heated floors: $1,000–$2,500
- Custom vanity: $2,000–$5,000
- Plumbing relocation or rough-in: $2,000–$5,000
- Waterproofing: $800–$1,500
- Electrical and ventilation: $1,000–$2,500
- Fixtures and accessories: $1,000–$3,000
- Labor: $4,000–$8,000
Based on 498+ GTA projects, the average bathroom renovation comes in at $14,800 — most homeowners opt for a mid-range scope that updates tile, vanity, and fixtures without moving plumbing.
Bathroom Cost Comparison Table
| Scope | Cost Range | Timeline | Best For |
| Cosmetic Refresh | $3,000–$8,000 | 3–5 days | Quick updates, rental properties |
| Mid-Range Reno | $8,000–$18,000 | 1–3 weeks | Most homeowners |
| Full Gut Reno | $18,000–$30,000+ | 3–6 weeks | Primary ensuite, accessibility |
---
Flooring Costs in Toronto
Flooring is one of the highest-impact upgrades you can make. Here's what each material costs installed in the GTA:
Flooring Price Per Square Foot (Materials + Installation)
| Material | Cost/sqft (installed) | Durability | Best Rooms |
| Luxury Vinyl Plank (LVP) | $3–$7 | High | Basements, kitchens, high-traffic |
| Laminate | $2–$6 | Medium | Bedrooms, living rooms |
| Hardwood (engineered) | $5–$10 | High | Living areas, bedrooms |
| Hardwood (solid) | $7–$12 | Very High | Main floors (not basements) |
| Porcelain Tile | $4–$10 | Very High | Bathrooms, entryways, kitchens |
| Ceramic Tile | $4–$8 | High | Bathrooms, laundry |
| Carpet | $2–$5 | Low–Medium | Bedrooms |
Average Flooring Project Costs
For a typical Toronto home (1,200 sqft of flooring):
- LVP throughout: $3,600–$8,400
- Engineered hardwood: $6,000–$12,000
- Solid hardwood: $8,400–$14,400
- Tile (bathrooms + kitchen only, ~300 sqft): $1,200–$3,000
Material vs. Labor Breakdown
| Material | Material Cost (%) | Labor Cost (%) |
| Luxury Vinyl Plank | 55–65% | 35–45% |
| Laminate | 45–55% | 45–55% |
| Hardwood | 60–70% | 30–40% |
| Tile | 40–50% | 50–60% |
Tile installation is the most labor-intensive — especially for complex patterns, heated floors, or large-format tiles. Based on our GTA project data, tile labor runs $4–$8/sqft for standard layouts and $8–$12/sqft for intricate patterns like herringbone.
Flooring Removal Costs
Don't forget removal of existing flooring:
- Carpet removal: $0.50–$1.50/sqft
- Tile removal: $2–$5/sqft (can increase if thinset is bonded to subfloor)
- Hardwood removal: $1.50–$3/sqft
- Subfloor repair or leveling: $1–$3/sqft if needed
---
Painting Costs in Toronto
Painting is the most affordable way to transform a space. Here are current GTA rates:
Interior Painting
| Area | Cost Range | Notes |
| Per square foot (walls) | $2–$5/sqft | Includes prep and 2 coats |
| Single room (12x12) | $400–$900 | Walls and ceiling |
| Entire home (1,500 sqft) | $3,000–$7,500 | All rooms, hallways, trim |
| Trim and baseboards only | $1.50–$4/linear ft | Sand, prime, 2 coats |
| Ceiling only (per room) | $200–$500 | Flat white typical |
| Stairway and hallway | $600–$1,500 | Height and access add cost |
Exterior Painting
| Area | Cost Range | Notes |
| Per square foot | $3–$7/sqft | Includes prep, prime, 2 coats |
| Average detached home | $4,000–$10,000 | Depending on size and condition |
| Semi-detached | $2,500–$6,000 | One shared wall |
| Townhouse exterior | $2,000–$5,000 | Front and rear |
| Deck staining | $3–$6/sqft | Sand, clean, 2 coats stain |
Cabinet Painting
Cabinet painting is a specialty service that has surged in popularity:
- Small kitchen (under 15 cabinets): $3,000–$5,000
- Medium kitchen (15–25 cabinets): $5,000–$7,000
- Large kitchen (25+ cabinets): $7,000–$8,000+
- Includes: degreasing, sanding, priming, 2 coats, new hardware install
Based on 498+ GTA projects, professional cabinet painting averages $5,400 and takes 4–7 days. It's the single best ROI kitchen upgrade — refreshing the look of a $30K kitchen for under $6K.
Painting: What Affects Cost
- Ceiling height: 9ft+ ceilings increase cost 15–25%
- Wall condition: heavy patching or skim coating adds $1–$3/sqft
- Color changes: dark to light (or vice versa) may need 3+ coats
- Trim complexity: crown molding, wainscoting add time
- Furniture moving: most painters charge extra or require empty rooms
---
Need professional kitchen & bathroom renovation?
Call RenoHouse at 289-212-2345 or get a free estimate today.
Get Free Estimate →Plumbing Costs in Toronto
Plumbing costs in the GTA are driven by the complexity and urgency of the job:
Common Plumbing Services
| Service | Cost Range | Notes |
| Service call / diagnostic | $100–$300 | Includes first 30–60 min |
| Faucet replacement | $150–$400 | Plus cost of faucet |
| Toilet replacement | $250–$600 | Including install and wax ring |
| Water heater (tank, 50 gal) | $800–$1,800 | Supply and install |
| Water heater (tankless) | $1,500–$2,500 | Higher efficiency, longer life |
| Drain cleaning | $150–$400 | Snaking or hydro-jetting |
| Bathroom rough-in | $2,000–$5,000 | New supply and drain lines |
| Kitchen rough-in | $1,500–$3,500 | Sink, dishwasher, fridge lines |
| Main sewer line repair | $2,000–$8,000 | Camera inspection extra ($200–$400) |
| Sump pump install | $800–$2,000 | Including pit and check valve |
| Backwater valve | $1,500–$3,500 | Often rebate-eligible in Toronto |
Emergency Plumbing Premiums
After-hours and emergency calls typically cost 1.5x–2x standard rates:
- Weekend service call: $200–$500
- After-hours (evenings): $250–$500
- Holiday emergency: $300–$600
Based on our project data, frozen pipe repairs in Toronto average $350–$800 during winter months, with January and February being peak demand.
---
Doors and Windows Costs in Toronto
Window Replacement
| Window Type | Cost Per Window (installed) | Notes |
| Standard vinyl (double-hung) | $400–$800 | Most common replacement |
| Premium vinyl (triple-pane) | $600–$1,000 | Better insulation, noise reduction |
| Wood-clad | $800–$1,200 | Premium look, higher maintenance |
| Bay/bow window | $1,500–$4,000 | Structural support may be needed |
| Basement egress window | $1,000–$3,000 | Includes well and cutting |
For a typical 3-bedroom Toronto home with 12–15 windows, full replacement runs $6,000–$15,000 depending on window quality. Energy rebates through the Canada Greener Homes Grant (or successor programs) can offset $1,000–$5,000.
Door Costs
| Door Type | Cost (installed) | Notes |
| Interior door (hollow core) | $150–$350 | Paint-grade, standard sizes |
| Interior door (solid core) | $250–$500 | Better sound, heavier feel |
| Front entry door (steel) | $1,000–$2,500 | Most popular, secure |
| Front entry door (fiberglass) | $1,500–$3,500 | Best insulation, wood look |
| Front entry door (wood) | $2,000–$4,000+ | Premium, requires maintenance |
| Patio sliding door | $1,000–$3,000 | Standard 6ft opening |
| Garden/French door | $1,500–$4,000 | Double door, more glass |
| Garage door (single) | $800–$1,500 | Steel, insulated |
| Garage door (double) | $1,200–$2,500 | Steel, insulated, with opener |
Garage Door Details
Garage door costs depend heavily on material and insulation:
- Non-insulated steel: $800–$1,200
- Insulated steel (R-16): $1,200–$2,000
- Carriage-house style: $1,800–$2,500+
- Opener replacement only: $300–$600
---
Drywall Costs in Toronto
Drywall Repair
| Service | Cost Range | Notes |
| Small patch (under 12 inches) | $150–$300 | Including texture match and paint |
| Large patch (12–24 inches) | $250–$500 | May need backing support |
| Water damage repair | $300–$800 | Includes mold check |
| Full sheet replacement | $200–$400 | Per 4x8 sheet, installed |
Full Room Drywall
| Service | Cost/sqft | Notes |
| Drywall install (hang only) | $1.50–$2.50 | Materials and labor |
| Tape, mud, and sand | $1–$2 | Finishing to Level 4 |
| Full install + finish | $2–$4 | Ready for paint |
| Ceiling drywall | $2.50–$5 | Overhead work premium |
| Garage drywall | $2–$3.50 | Often fire-rated required |
For a typical 12x12 room (walls and ceiling, ~580 sqft of drywall), expect $1,200–$2,300 for complete installation and finishing. Based on 498+ GTA projects, drywall finishing quality is the #1 factor homeowners notice — Level 5 finish adds 20–30% but is worth it for living spaces.
Popcorn Ceiling Removal
A common request in GTA homes built before 1990:
- Per square foot: $2–$4/sqft
- Average room (12x12): $300–$600
- Asbestos testing: $50–$150 (mandatory for pre-1990 homes)
- Asbestos abatement: $8–$15/sqft (if positive)
---
Deck and Exterior Costs in Toronto
Deck Building Costs Per Square Foot
| Material | Cost/sqft (installed) | Lifespan | Maintenance |
| Pressure-treated wood | $25–$40 | 15–20 years | Stain every 2–3 years |
| Cedar | $35–$55 | 20–25 years | Stain every 2–3 years |
| Composite (Trex, etc.) | $45–$65 | 25–30+ years | Minimal — wash annually |
| PVC/Cellular | $55–$75 | 30+ years | Almost none |
| Ipe/Hardwood | $50–$75 | 30+ years | Oil annually |
Average Deck Project Costs
For a 200 sqft deck (typical Toronto backyard):
- Pressure-treated: $5,000–$8,000
- Cedar: $7,000–$11,000
- Composite: $9,000–$13,000
- PVC: $11,000–$15,000
Add for extras:
- Railing (per linear foot): $30–$80
- Stairs: $500–$2,000
- Permit (Toronto): $300–$700
- Post footings: $150–$300 each
Deck Repair vs. Replace
| Condition | Action | Cost |
| Surface boards rotting | Board replacement | $500–$2,000 |
| Structural issues (joists) | Major repair | $1,500–$5,000 |
| Overall deterioration | Full replacement | $5,000–$15,000+ |
| Cosmetic refresh | Power wash + stain | $300–$800 |
---
Factors That Affect Renovation Costs in Toronto
1. Age of Your Home
Toronto has housing stock spanning 100+ years. Older homes in established neighborhoods like the Beaches, Leslieville, Roncesvalles, and parts of North York often have:
- Knob-and-tube wiring: must be replaced before insulation ($3,000–$8,000)
- Galvanized or lead pipes: replacement recommended ($2,000–$6,000 per floor)
- Plaster walls: harder to work with than modern drywall
- Non-standard framing: custom solutions increase labor time
- Asbestos in various materials: testing and abatement add cost
Based on our data, renovating a pre-1960 home costs 15–30% more than the same scope in a home built after 2000.
2. Permits and Inspections
Toronto building permits are required for:
- Structural changes: removing or modifying load-bearing walls
- Plumbing changes: adding or relocating fixtures
- Electrical changes: new circuits, panel upgrades
- Additions and decks: any new structure
- Window enlargement: changing opening size
- HVAC changes: new ductwork or equipment
Permit costs in Toronto range from $200–$2,000+ depending on project scope. The permitting process can add 2–6 weeks to your timeline. Always factor this into your budget and schedule.
3. Winter Work Premium
Renovation in Toronto during winter (December–March) has trade-offs:
Advantages:- Contractors are less busy — more scheduling flexibility
- Some contractors offer 5–15% discounts
- Interior work is unaffected by weather
- Exterior work (decks, windows, roofing) may be limited or costlier
- Heating costs during renovation (open walls, doors)
- Delivery challenges during heavy snow
- Frozen ground makes foundation/excavation work expensive
4. Material Costs in 2026
Material prices have stabilized somewhat after the 2021–2023 surge, but remain elevated:
- Lumber: 20–30% above 2019 levels
- Copper: near historic highs
- Quartz countertops: stable, wide range
- Tile: relatively stable, import costs vary
- Appliances: supply chain normalized, but premium brands have 4–8 week lead times
5. Labor Market
Skilled trades in the GTA remain in high demand. Expect:
- General labor: $25–$40/hour
- Skilled carpenter: $40–$65/hour
- Licensed plumber: $80–$130/hour
- Licensed electrician: $80–$120/hour
- Tile setter: $45–$75/hour
---
How to Budget for Your Toronto Renovation
Step 1: Define Your Scope
Be specific about what you want. "Renovate the kitchen" is too vague. Instead:
- "Replace cabinets, install quartz counters, new tile backsplash, keep existing layout"
- This clarity helps contractors provide accurate estimates
Step 2: Add a 10–20% Contingency
Every renovation uncovers surprises — especially in older Toronto homes. Our recommendation:
- Post-2000 home: 10% contingency
- 1970–2000 home: 15% contingency
- Pre-1970 home: 20% contingency
Step 3: Prioritize Must-Haves vs. Nice-to-Haves
Divide your wish list into two columns. Fund must-haves first, then add nice-to-haves if budget allows.
Step 4: Get Multiple Estimates
We recommend getting 3 estimates for any project over $5,000. Compare:
- Scope of work (are they quoting the same thing?)
- Materials specified
- Timeline
- Payment schedule
- Warranty
Financing Options
- Home equity line of credit (HELOC): typically lowest interest rate
- Personal line of credit: no home equity needed, higher rate
- Contractor financing: some offer payment plans — read the terms carefully
- Credit cards: only for small projects — interest rates are punishing
- Government rebates: check for energy efficiency programs (windows, insulation, HVAC)
When to DIY vs. Hire a Professional
| Project | DIY Friendly? | Why / Why Not |
| Painting (interior) | ✅ Yes | Save 50–70% on labor |
| Laminate/LVP flooring | ✅ Yes | Click-lock is beginner-friendly |
| Tile backsplash | ⚠️ Maybe | Requires precision, grouting skill |
| Tile floor | ❌ Not recommended | Subfloor prep and leveling critical |
| Plumbing | ❌ No | Code compliance, leak risk |
| Electrical | ❌ No | Safety hazard, permit required |
| Drywall (small patch) | ✅ Yes | YouTube tutorials work well |
| Drywall (full room) | ❌ Not recommended | Finishing is a real skill |
| Deck building | ⚠️ Maybe | Footings and structure need experience |
| Cabinet painting | ⚠️ Maybe | Prep-intensive, finish quality matters |
---
Frequently Asked Questions
How much does a full home renovation cost in Toronto?
A full home renovation in Toronto typically ranges from $80,000–$200,000+ for a 1,500–2,500 sqft home, depending on scope. A cosmetic refresh (paint, flooring, fixtures) might be $30,000–$50,000, while a full gut with kitchen, bathrooms, and structural changes can exceed $150,000. Based on 498+ GTA projects, the average whole-home renovation is $95,000.
What is the most expensive part of a renovation?
Kitchens are consistently the most expensive room to renovate, followed by bathrooms. Within any project, labor typically accounts for 35–50% of total cost, with cabinetry and countertops being the highest material costs.
How long does a renovation take in Toronto?
| Project | Typical Timeline |
| Single room paint | 1–2 days |
| Bathroom renovation | 1–4 weeks |
| Kitchen renovation | 3–8 weeks |
| Basement finishing | 4–8 weeks |
| Full home renovation | 3–6 months |
| Addition | 4–8 months |
Permit approval can add 2–6 weeks. Always plan for delays.
Do I need a permit for my renovation in Toronto?
You need a permit for structural changes, plumbing or electrical modifications, additions, decks, and window enlargements. Cosmetic work (painting, flooring, replacing fixtures in kind) does not require a permit. When in doubt, check with Toronto Building at 416-397-5330 or visit toronto.ca/building.
Should I renovate before selling my home?
Focus on high-ROI improvements: kitchen cosmetic refresh (75–100% ROI), interior painting (100%+ ROI), flooring replacement (70–90% ROI), and bathroom updates (60–80% ROI). Avoid over-improving for your neighborhood.
How can I reduce renovation costs?
- Get multiple quotes and compare scope, not just price
- Keep the existing layout (avoid moving plumbing/electrical)
- Choose mid-range materials — the jump from mid to premium is steep
- Bundle multiple projects for better contractor rates
- Be flexible on timing — winter scheduling can save 5–15%
- Do demo yourself (with contractor approval)
What's included in a renovation estimate?
A good estimate should include: scope of work, materials specified, labor costs, timeline, payment schedule, warranty terms, permit costs, and exclusions. If an estimate is a single number with no breakdown, keep looking.
---
Get Your Free Renovation Estimate
Every renovation starts with a conversation. At RenoHouse, we provide detailed, transparent estimates for all types of home renovations across Toronto, Mississauga, Brampton, Vaughan, Markham, Richmond Hill, Oakville, and the entire GTA.
No pressure. No hidden fees. Just honest pricing from experienced contractors.📞 Call us at 289-212-2345 or request your free estimate online. We'll visit your home, understand your goals, and provide a detailed written quote — usually within 48 hours.
*Prices in this guide reflect 2026 GTA market conditions and are based on data from 498+ completed RenoHouse projects. Your actual costs may vary based on specific conditions, material selections, and scope of work. All estimates from RenoHouse are free and come with no obligation.*






